Managing Delivery Plans Streamlined
Managing Delivery Plans Streamlined
In typical construction projects, project schedules are created with a high degree of planning. For each of these schedules, the deliverables are created separately by the people who work on the deliverables. The deliverable plan is to be in synchronize with the corresponding schedules (all deliverables linked to a schedule must be completed within the schedule’s plan).
In SmartProject when deliverables are linked to schedules, the plan dates of the schedules are not updated with the deliverables. Planners need to update each deliverable separately with planned dates which are time-consuming and error prone. To address this, now the scheduled task’s plan dates can be automatically updated to all linked deliverables by default so that the planners can modify the schedule dates where required.
Related Posts
Easier Configuration and Maintenance of your Master Data
The Masters’ module comprises the mandatory data that should be available in WRENCH SmartProject which enables smooth functioning of the application. The entire configuration and management of Master data is now moved from the SmartProject…
Managing Resource Costing Simplified
As Engineering resource planning and management is integral to successful project delivery within time and budget, engineering resource costing is essential for analyzing resource cost variance in Project Management to track Project Profitability. Currently, these…