Wrench Solutions - Project Management Information System
MENUMENU
  • Solutions
        • By Modules
          • EDMS
          • Project Scheduling and Forecasting
          • Engineering Deliverable Management
          • Procurement Management
          • Construction Monitoring & Control
          • Project Control System
          • Quality Management
          • Quality & Safety
          • Cost Control & Cashflow Management
          • Risk Management
          • Safety Management
          • Snagging and Project Closure
          • Integrated Project Management System
        • By Firms
          • Owner
          • PMC
          • Engineering Consultant
          • Contractors
        • By Industries
          • Infrastructure
          • Construction
          • Energy
  • Customers
    • Customers List
    • Projects
    • Testimonials
    • Case Studies
  • Resources
    • Resource Centre
    • Blog
    • Support
    • Whitepaper
    • Webinar
    • Wrench Academy
    • Integrations
  • Company
    • About Us
    • Careers
    • News
    • FAQ
    • Contact Us
  • Request Demo
CONTACT USREQUEST DEMO

Testimonials

“We have found it to be an excellent tool to maintain project documentation integrity, monitor workflows, provide project status in real-time”
- Romolo Raciti, Ch2Mhill VECO Engineering, UAE

“Thanks to WRENCH we managed 58 projects with just 13 people in project controls. The biggest benefit is: we were able to reduce delays to such an extent that our projects are now ahead of schedule, which is amazing”
Ayman El Tannir
Head of Project control - China Petroleum Engineering, Abudhabhi, UAE
“With WRENCH SmartProject, I have total control of ALL my engineering deliverables even the ones that are handled by multiple people, across different groups and locations.”
C. Shelley
Manager, Planning - Vatech Wabag Ltd, Chennai, India

“We already had SAP, CAD, email, etc., but EPC is such a competitive sector that we thought we should invest in something that can give us an extra advantage, WRENCH gave us that advantage.”

Shailendra Ostwal
IT Head, Galfar Almisnad Engineering & Contracting WLL

“I found the system very easy to use and flexible enough to cater all my requirements.”

Piyush Pandey
Manager, ESSAR

“After switching to WRENCH, I am confident that even our most demanding customers will be satisfied with the quality of every deliverable. The remote monitoring and automated report functions have given our managers complete control. For the first time we can avoid most of the rework and delays and from now on our projects can be completed on time without major firefighting.”

Naghman
IT & Systems Director, BICC Contracting

“In any customer-centric organization, it is crucial that we find ways to manage the multiple processes that go into efficient project management. Although we were skeptical at first, WRENCH SmartProject has proved to be the perfect solution for our company’s needs – it has given our project managers the freedom to focus on customer management and the many details of project execution without worrying about the status of those all-important documents, reports, and engineering drawings.”

Venkataswamy
Head, Quality, VAtech Wabag Ltd, Chennai, India

“This solution is an IDEA whose time has come. (It is) a business solution that enforces business process and thus ensures quality. Engineering data management is incidental as it captured along the process.”

R.D. Augustus
Manager, Quality, Metito Overseas LLC, UAE

“The high degree of customization and built-in industry best practices helped us control schedules at every step.”

Rajat Pradhan
Project Management Group, Rays Power Infra

“We are finding the following features of WRENCH SmartProject extremely useful: Workflow Process, Flexible Folder structure, Revision & Version Control, QMS enforcement.”

V.P. Shenoy
Head of Engineering, Godrej

“A really robust and user-friendly system developed from actual client requirements. I have evaluated and worked with many systems over the last 25 years and I think this one is remarkably well suited for an engineering company.”

Stephen Petch
Manager Project Controls, Tetratech WEI Inc Ltd, Toronto, Canada

“Now that WRENCH has passed our evaluation process above 7 other competitors in terms of performance, user-friendliness, adaptability, and price, then I believe that I would be selecting WRENCH for quite a few more years without bothering going through a lengthy evaluation process (which started 5 weeks before WRENCH came into the picture).”

Michael Pickup
Director, Quality, Rise above alliance (Rep as Leighton Ltd), Abu Dhabi, UAE

“We have seen so many tools in the market but haven’t seen anything which is integrated and brings complete EPC visibility for me.”

Vikram Rao
GM-Project Controls, Essar

“We asked WRENCH to fill in the gaps left by our older project collaboration and document management software, and they certainly exceeded our expectations with their integrated cloud solution SmartProject!”

Rajiv Verma
VLDM, Vatika Group

“This is a well-designed system. They (WRENCH Team) really understand the turnkey project process and this industry…I was surprised by how much functionality is packed into one product and how well it integrates with all our existing systems. I can honestly say that it is the best I.T. investment we have made till now.”

Mohd Sadek
Deputy Project Director, BICC Contracting

“This system helped us in quick and effective decision making by providing an information platform to track all our projects online – from the overall progress to intricate details like deliverables, schedules, and responsibilities.”

N. Sivasubramanium
General Manager, Qatar Design Consortium - Doha, Qatar

Wrench has got an excellent team, keep them all safe and happy in these difficult times. We are lucky to have worked with you and your team.

A leading Public sector Limited Company in India
GM (Project Planning & Monitoring),

“Getting onto this solution was one of the best business decisions we have made. During our annual meeting, our senior managers voted it the ‘The best thing to happen this year’.”

Senior Engineer, TATA POWER -SED Mumbai, India

“With WRENCH SmartProject we can get the real-time status of key milestones for each deliverable, as well as its % status. We have gained complete control over the schedules of the project. The online report functionality has helped us to review project status periodically with the stakeholders and reassure our client by providing real-time and accurate status reports.”

Gautham Chakladhar
DGM, Engineering, BHEL-Transmission Division, New Delhi, India

“After calling in WRENCH, the delay-causing issues in our process are completely solved, thanks to WRENCH SmartProject’s centralized database, workflows, master document list, tracking documents, and scheduling.”

Abhishek De Sarkar
STEAG

“Now we can share real-time engineering data that is created by our internal team, our other branches, vendors with the site, clients and consultants. WRENCH SmartProject enables us to put all the stakeholders of a project on a single page.”

Jacob James
DGM, BHEL-PEM New Delhi, India

“As you know I worked very closely with your team and to me, it has been a very fulfilling experience. I must say that you and the team have developed a world-class product. Both the implementation and the support have been great. I am hoping that WRENCH SmartProject helps SIDVIN to achieve greater heights by showcasing end to end development supported in it. We are already using most of the features. I have had a great rapport with you and have learned a lot. So, a sincere ‘thank you’ to you and your team.”

Kshiti Kothari
Vice President, IT, Sidvin Core-Tech (I) Pvt. Ltd. An ISO 9001:2008 Certified Company

“The key points regarding (the) SMART PROJECT system: 1. Excellent Document Management System, where all history is maintained, including letters, faxes, transmittals, specs, drawings, etc. 2. Excellent Earned Value System, where the rule of credit can be chosen in agreement with the client, which makes invoicing very simple. The rule of credit is flexible and can be different from client to client. 3. Excellent Tool for Quality Audit, where auditors can obtain all history and information regarding deliverables and processes, including evidence of IDC, ISC, etc. 4. The only negative point about WRENCH is the time required for processing, such as ISC, where it is a bit slow. This can be improved by a further modification to the system by the vendor. In the final analysis, I don’t know of any available system that can perform better than WRENCH SmartProject.”

Bill Adhami
Engineering & Quality Manager, CH2M

“We now have a centralized system where all project processes can be customized and implemented as per our exact requirements.”

BKGulf

“I am astounded by how easily and quickly they re-aligned all our processes. So many inefficiencies have now disappeared. I couldn’t be more grateful.”

John Mathew
Director(Operations), Chalmers

“Before implementing SmartProject more than 70% of our projects used to get delayed. Now no project gets delayed as WRENCHSP’s early warning system helps us take corrective action in time.”

F.R. Singhvi
Joint MD, Sansera Engineering

“The WRENCH implementation was a major success and has undoubtedly helped us to streamline our process and enhanced our overall productivity.”

Colin Pickering
Project Director, Saadiyat Beach Resort Project

“As an engineering company, what we produce and what we are paid for is engineering drawings and documents managing the schedules, process and data related to these deliverables is most important for our business. We decided to implement WRENCH SmartProject to have complete control of these elements.”

Ian Humphries
Group Head, Engineering and Procurement, Simon Carves Ltd, Manchester, UK

“We had only thought of electronic data management, never expected all-around impact like this. Every phase from planning to delivery has been optimized.”

Ghandour
Project Director, BICC Contracting
“100% time saved due to assurance of working with the latest drawings and documents, 100% savings due to quality process being properly enforced, 100% payment realization due to real-time reports.”
Atul R Sandhan
Assistant General Manager - Civil, Tata Consulting Engineers

Company

  • About us
  • News
  • Contact us
  • Careers

Solutions

  • EDMS
  • Engineering Deliverable Management
  • Project Control System
  • Procurement Management
  • Construction Management
  • Budget & Cashflow
  • Integrated Project Management System

Firms

  • Owner
  • PMC
  • Engineer
  • Contractor

Resources

  • Resource Centre
  • Blog
  • Case Studies
  • Projects

Contact

  • Icon [email protected]

Subscribe to our Newsletter

© 2021 Wrench Solutions. All rights reserved.

Acceptable Use Policy | Privacy Policy