BSPL opts for Wrench SmartProject on 3.5 MTPA Project
BSPL opts for Wrench SmartProject on 3.5 MTPA Project
India, 11th September 2024: Baldota Steel & Power Limited (BSPL), the Baldota Group’s foray into the steel manufacturing space, has chosen to implement Wrench SmartProject EDMS on their upcoming integrated steel plant at Hospet, Karnataka. The 3.5 MTPA is envisaged with an investment of INR 18,000 Crores and will be set up in 2 Phases. Phase 1, commissioning is planned by Quarter 2 of 2026.
BSPL needed a system to manage internal project collaboration. They opted for the SmartProject Engineering Deliverable Management System which provides the required third party software integrations, including integration with their Email software Outlook, their project planning and scheduling software MS Project and Primavera respectively, and with SAP.
Said Harish Parihar, Head of Sales This is an important project for BSPL. Smooth collaboration is essential, both between project participants as well as all between all the involved software systems, and our SmartProject platform provides the secure common workspace needed to achieve this.”
BSPL is open to upgrading to the Wrench SmartProject PMIS in the future.
Related Posts
L&T Realty Implements Wrench-PMIS Across Its Portfolio
L&T Realty implemented Wrench-PMIS across all its residential and commercial developments to digitally manage the complete project lifecycle — from initiation to final handover. The platform integrates with Salesforce CRM, Microsoft Project, BIM, and ERP…
Gulf Keystone Petroleum Selects Wrench SmartProject for Concurrent Engineering
Gulf Keystone Petroleum Limited, a UK-based oil field management company, has chosen Wrench SmartProject as its Concurrent Engineering solution for pipeline design and field-integrated asset management. With Wrench SmartProject: ✔ All pipeline designs and drawings…