Turn AWP Theory into Executable Reality
Purpose-built to operationalise AWP end-to-end—from early engineering through procurement, construction, commissioning, and handover—ensuring every work package is complete, constraint-free, and executable.
What Does it Do
Construction-Driven Planning (Path of Construction First)
Wrench-SmartProject enables planning from construction and commissioning backwards, ensuring:
- Operations and commissioning requirements shape the Path of Construction
- CWAs, EWPs, procurement packages, and CIWPs are logically aligned
Level-3 and Level-4 schedules are fully AWP-driven
Integrated Work Packaging Across All Delivery Systems
AWP only works when every system speaks the same language.
Wrench-SmartProject natively links:
- Engineering → EWPs & deliverables
- Procurement & Contracts → Package strategy, long-lead items, supply timelines
- Construction → CWAs, CIWPs, execution readiness
- Cost Control → Direct & indirect cost aligned to packages
- Schedule & Progress → AWP-coded, package-based tracking
- Material Management → Package-wise material readiness
Result: One source of truth for AWP execution
CWP-Ready Planning — Even When Engineering Is Immature
When engineering is not yet at full detail:
- Plan using Level-3 schedules
- Define CWAs, EWPs, and procurement packages early
- Progressively mature CIWPs as engineering develops
- Automatically validate CIWPs against the evolving plan
This allows projects to start right without waiting too long.
Change-Resilient AWP Execution
AWP often breaks down when execution strategies change—split contracts, new contractors, resequencing.
Wrench-SmartProject ensures:
- Changes are captured beyond cost & schedule
- Packaging, WBS, coding, and execution strategies are updated together
- Change implementation workflows keep all systems aligned
No silent misalignment. No broken AWP chains.
Manage AWP Data Without Overloading Your Team
AWP generates massive volumes of interdependent data.
Wrench-SmartProject simplifies this by:
- Providing role-based package dashboards
- Enabling CIWP leads and package managers from Day One
- Automating status roll-ups across engineering, procurement, materials, and construction
- Highlighting constraints before they hit the field
AWP Implementation — Digitally Guided, Step by Step
Wrench-SmartProject supports the full AWP lifecycle, including:
- Execution strategy definition
- Project coding & numbering systems
- CWAs, EWPs, procurement packages
- Level-3 & Level-4 schedules
- Cost, material, and progress systems
- CIWP development & validation
- Baseline, monitor, update, and re-plan
- Risk & change management embedded into execution
You don’t just plan AWP. You work the plan, monitor the plan, and continuously improve the plan.
Business Outcomes You Can Expect
- Up to 10% project cost reduction
- Up to 25% improvement in field productivity
- Shorter, more predictable schedules
- Constraint-free work fronts
- Improved safety & reduced rework
- Clear accountability across packages
- Full alignment from engineering to handover
Ready to Make AWP Work on Your Projects?
Stop planning AWP in silos. Start executing it with confidence.
30 minutes • Live walkthrough • No obligation